Tuesday, May 21 – Deadfall Trap Project (Day 6 of 8)

Shape of the Day

  • Attendance
  • Yellowjackets Season 3 will be filming on Tuesday, May 28
    • Will be some disruptions with traversing the main floor and 2nd floor hallways
  • Project – Build an Electromagnet – can re-submit for one week after getting it back
  • Electroplating
  • Deadfall Trap Project
    • There are now smaller masses for testing
      • 4 x 25 g
      • 4 x 50 g
      • 4 x 75 g
    • How many groups have successfully triggered with 5g?
      • Can use the 5g trigger mass attached via a string and pulley to the crossbar
    • Should be finished building a first prototype (and have a picture for the FBD’s)
    • Should be experimenting with other prototypes
      • Can re-use/modify sticks from previous prototypes to save time
    • Draw the free body diagrams of the 3 sticks and the rock (4 FBD’s total)
      • Include angles and lengths
    • Write out equations
      • Try to relate the equations back to what you observed worked well/poorly during construction of your first prototype
      • Have unique names for each force, across all 4 FBDs
      • End up with 12 equations and 12 unknowns
    • Last work day: Thursday, May 23
    • Due date: Friday, May 24
  • Wrap-up